Return to the Hub
Confirmation Instructions
- Hello, and welcome to this brief tutorial on confirmation instructions.
- In the following slides, we're going to discuss the active versus passive role of operators, cover the confirmation deadlines,
- point out a few specifics related to confirmations in the PNT scheduling model.
- Then we are going review the screen and provide an example of how to submit confirmation.
- One of the first decisions that operators on Southern Star will need to make is the decision to be either an active point operator or a passive point.
- Operator.
- Active point operators will submit a separate communication expressly confirming or reducing each nomination transaction for every cycle every day.
- Passive point, operators are relieved of their obligation to send a However, passive operators will still have the ability to make reductions for any cycle
- on any day.
- The point operator election form found under downloads must be completed and sent to Southern Star indicating the point operators choice to be active or passive.
- Southern star has five cycles for every gas day, the confirmation deadline for the timely cycle is 430 PM on the day before flow.
- For the evening cycle, it's 8.30 p.m.
- the day before flow.
- The ID1, 2, and 3 cycles occur on the Day of Flow.
- And the time for ID 1 is 12. 30 pm, the Time for Id 2 is 5 p m, And The Time For ID 3 is 9.00 30 pm.
- There are a few specific points to be made about confirmations.
- First, confirmation in the pathed non-threaded scheduling model occur at the shipper level.
- Therefore, contract data is not included on the confirmation screen.
- So if a specific shipper uses multiple contracts to flow gas on a single location, the operator is only going to see the total at that location not the
- contract detail.
- Secondly, confirmations can be made past the end date of the nomination.
- CSI will default to the current month end-date.
- However, operators can shorten this date range.
- On this slide, we see the confirmation screen.
- At a glance, We see, the search criteria section at the top.
- This is where the operator will choose a begin date and cycle.
- And the results can be filtered by a specific location or location zone.
- To see only unconfirmed nominations, just click the box to show un-confirm only.
- The confirmation summary grid is next, and this lists the total quantities by location.
- The final grid is the location grid, and it will display nominations by shipper.
- It includes the confirmation type, which is active or passive, as we discussed earlier.
- And includes a flow direction, the begin date of the nomination.
- it also includes then shippor name and quantity as well as other location and cycle specific information.
- So to perform a confirmation, the operator will set the search criteria and select retrieve.
- In step two, operator reviews all unconfirmed quantities and makes any necessary reductions.
- The third step is to set desired end date.
- And in step four, to choose the items to confirm, box beside confirm will confirm all line items, or each item can be confirmed individually by checking
- the box associated with it.
- The final step in the process once all confirmations are done is to hit the submit button and submit the confirmation to Southern Star.
Printable Documents
- Confirmation Instructions PDF
- Critical Winter Weather FAQ’s PDF
- CSI Screen Icon Legend PDF
- EDI Confirmations Worksheet PDF
- Interpreting Balance Box Data PDF
- Nomination Instructions 08 & 01 TT PDF
- Nomination Instructions P&L 26 27 28 29 TT PDF
- Nomination Instructions Payback and Authorized Overrun TT 03 04 02 12 13 112 PDF
- Nomination Instructions Storage 06 07 12 13 22 TT PDF
- PNT Overview PDF
- Reduction Reason Codes PDF
- Reports Replacement List PDF
- Scheduling Timelines PDF
- Transaction Types PDF
- Understanding PNT Ranks Summarized PDF
Was this resource helpful?
Thanks for your feedback.