1. Welcome everyone to this walkthrough of Southern Star's new PSO dashboard.
  2. Throughout the next couple of minutes, we will demonstrate the functionality of this new and improved tool.
  3. If by the end of the video you have questions, please do not hesitate to reach out to your Southern star customer service rep.
  4. As you come into the PSo dashboard, you will initially see six panels.
  5. We will drive the demonstration for the dashboard from top middle panel labeled constraints.
  6. Displayed in this panel are the constraints currently scheduled on the system.
  7. You can change the date range for constraints being displayed by clicking on the slicer on far left hand corner of your screen.
  8. This will allow you to change dates by click on calendar and choosing the dates you want.
  9. For this example, we will choose September 2, 2019. You narrow the selection even further by Clicking on Calendar in the second box and choose another date.
  10. In this case, we will select September 30th, 2019. As you can see, our constraints are now limited to September 3rd,2019 through September 27th 2019 To
  11. return to the full list, We will clear out the dates in the two boxes.
  12. For our demonstration, I'm going to put back in today's date in that top box.
  13. I will now close the filter panel by clicking on the slicer on right side of the panel.
  14. We are now back to our original screen with our Original Constraints.
  15. The upper left-hand panel shows the legend for the constraints.
  16. the lower left hand panel, shows a constraint reduction percentage in one tab, and the plan service outages in progress for this system.
  17. When you click on a specific constraint, note the changes in each panel.
  18. In the lower middle panel you will notice the map changes to the area affected by the constraint.
  19. In upper right hand corner of the screen you have two tabs to choose from, Constraint Locations and Constrained Pulling Areas.
  20. If you click on the second tab, constraint pulling areas, you can see that the list for constraint pull areas changes when you change constraints.
  21. In the lower right hand corner of the screen, you have two tabs to choose from.
  22. Operational Capacity and Work Activity.
  23. The Operating Capacities tab will give you information concerning the operational capacity of affected constraints.
  24. You can see these will be updated as you change constraints The Work Activities Tab shows you the information about the work project affecting a constraint.
  25. These will also be changed as constraints are changed.
  26. Each panel can be expanded using the arrows in the upper right hand corner of each panel.
  27. And reduce back to normal size by clicking on the arrow again.
  28. In the very top right corner you'll notice three lines.
  29. Once you click on this icon you will see two options.
  30. Download PSO PDF version, which will allow you to download and print the entire PSo, and historical average ID.3 schedule volumes through constraints.
  31. This will allow customers to gain knowledge on historical volumes, through system constraints
Printable Documents

Was this resource helpful?